• Customer: Tecnalia (InGrid Building)
Area: Electrical Installation and Assembly
Description:
– Construction of one 220 KV substation.
– Disassembling the laboratory in Burzeña, transportation, assembly and putting the laboratory back into operation in the InGrid Building.
– General Medium Voltage and Low Voltage electrical installations in the InGrid Building.